Cost drawn from the model itself.
QUANTITIES · COST · LIVE
Quantities and cost drawn from the model itself, updating as the design moves.
5D takes quantities and cost straight from the model rather than a separate take-off, so the number moves with the design instead of lagging it. Change the geometry and the cost follows.
That closes the gap between design decision and cost consequence — the place where budgets are usually lost.